Cannot load comments list

Go to the dashboard

Image file with a title:
LEAP Dual Water Mains Project Area

Description

Document of Project LEAP dual water main from an email dated Monday, March 20, 2023 3:20 PM from Shaiza Sajjad,Staff Engineer, with American Structurepoint, Inc. From the email, American Structurepoint, Inc., has been tasked to perform utility coordination for 277,600 feet (52.6 miles) long dual water mains design project starting at the Wabash River near the intersection of W 200 S and S 500 W, and terminating at the intersection of State Road 32 and 500 W. The water mains pass through Tippecanoe, Clinton and Boone counties.

View more